Work order, concept-and-model comparison, review, movement and records for The water carrier. The build pass follows the next geometry pass, recaptures and has the model reviewed again; the model is finished when its independent review passes.
What is the next geometry pass?
All-angle sheet ↗No blocking source/rig change required; coordinator pipeline remains pending.
How does the model compare with its concept?



Capture filtering
Cleaned audit side, back and body views hide explicitly declared staging groups. These can include a held prop, such as Padmasambhava’s staff; canonical front and three-quarter captures preserve those authored objects. Filtering is recorded separately from geometry scores.
What did the review find?
- cohesion
- 0/4
- fidelity
- 1/4
- silhouette
- 0/4
- anatomy
- 0/4
body · bound
Connected elbows preserve original forearm lengths; authored seated rest closes prior defects.
Next: See scoped verdict and concrete work order in adjacent REVIEW.md.
body · liberated
Connected elbows preserve original forearm lengths; authored seated rest closes prior defects.
Next: See scoped verdict and concrete work order in adjacent REVIEW.md.
Keep
- Connected elbows preserve original forearm lengths; authored seated rest closes prior defects.
- Black bound eyes, white-gold liberated eyes; outlined and uncropped inspected framing.
How does it move?
not audited
No movement gaps recorded in this audit.
Where does the world plan put it?
Which records stand behind it?
Pass history · 2
- 2026-10-13 · Pre-PM integration baseline e55afb38. Original concept and every form/front/three-quarter capture and all-angle/member evidence preserved. Baseline commit date; not owner approval. Capture ↗
- 2026-10-13 · Pre-PM integration baseline 1fcf232b. Original concept and every form/front/three-quarter capture and all-angle/member evidence preserved. Baseline commit date; not owner approval. Capture ↗
Sources and placement records · 0 placements
prototypes/prerendered-look/parts/purelands/asura-water-carrier.js